CALL TODAY!

(408) 732-4057











people love us on Yelp

Kuehne Construction is proud to be Diamond Certified

Ground Up Construction

 

City of Fremont Fire Station # 6

Construction of a 14,000 sf two story essential services facility with the latest in fire station technology and a 4 engine apparatus bay.

 

Homestead / Kiley retail building, Santa Clara

Ground up construction, including underground to new retail strip center.

 

Story Road Retail

Construction of a new 5000 sf retail structure built on an existing concrete slab on grade.

 

Atlas Building

Construction of a new industrial building

 

Hertz Car Wash & Fuel Station, Santa Clara

Excavation, grading & erection of a new steel fuel depot and automated carwash station

 

Park Ave Building, San Jose

Demolition of existing building and slab and the construction of a 4500 sf building.

Tenant Improvement:

City of Mountain View Public Library Modifications

Demolition and remodel of first floor offices, sorting stations, book returns, lobby casework and seating areas.

 

PLX Technology, Sunnyvale

Projects include the following: Construction of new offices, server rooms, cafeteria, conference room, new lobby and two new labs.

 

City of Palo Alto: Fire Station No. 1 & No.2 Tenant Improvement

Simultaneous remodel of both fire stations including new kitchens, restrooms, showers and bunk rooms.

 

City of Fremont Fire Station No. 1

Seismic upgrade, complete remodel and new apparatus bay and living quarters.

 

City of Campbell Orchard Community Banquet Hall Renovation

Renovation and addition to an existing one story building

Retail:

 

Willow Glen Plaza, San Jose

Façade revitalization of a 77,000 sf shopping center.

 

Maplewood Plaza, San Jose

Façade improvement consisting of 19 retail spaces, 3 restaurants. New exterior stucco, paint, new Mansard roof and new illuminated signage

Clean Rooms:

 

Allergan, Campbell

Manufacturing Core improvements and Office Core improvement projects

 

Biovision, Milpitas

Installation of clean room ceilings, metal stud framing and drywall

Health Care Facilities:

 

Lytton Gardens, Palo Alto

ADA remodel upgrades, new windows, doors, siding, deck repairs, solar panel replacements and elevator expansion

 

Valley Care Health System, Livermore and Pleasanton

New countertops in various offices and tile walkway repair.

Restaurants:

 

Left Bank Restaurant, Santana Row, San Jose

Wall repair behind large grills, new lighting, handrails & mural in the outside seating area.

Acoustical Ceiling, Canopies, Clouds & Integrated Ceiling Systems:

 

City of Campbell, Orchard Community Banquet Hall

Installed a TechZone integrated ceiling system

 

Medical/Dental Office Center, San Jose

Installed high end acoustical ceiling systems with accessories including light canopies.

 

VA Hospital, Vallejo

Upgraded existing ceiling with a new high end acoustical ceiling and Armstrong woodworks. Radius clouds with axiom trim.

Metal Studs, Drywall, Interior Architectural Frames & Doors:

 

Medical/Dental Office Center, San Jose

Layout, frame and various Level 5 finishes at walls, ceilings and soffits. KD & architectural aluminum frames, various pre-finished solid core doors for six office suites.